SKYWAY BRIDGE

The Skyway Bridge projects, phases one and two, are by far the largest single scope ventures performed by our company to date totaling over 2.5 million dollars in sawcutting, combined. Both projects, performed for FL DOT and M&J Construction, involved the reinforcement of the segmented, precast concrete piers after a container ship collision, and after the bridge was identified as a top ten terrorist target in 2009. These projects posed challenges for both equipment and operators who cored and extracted over 1,200 holes from seven to fifteen-foot-deep and 128 holes at sixty-two feet deep. These holes were drilled on working surfaces up to eighty-foot-deep within the concrete piers, in a space a little smaller than that of a typical mini-van!

Concrete Cutting, Coring, Removal, and GPR Scanning.

Speedy is Ready to Serve!!