Greetings from the Gulf Side!

Summer is approaching and the heat is rising here in Tampa. Just a reminder to keep hydrated, drink plenty of water and Gatorade!  We continue into May with an extremely busy schedule with no end in sight. Chris Smith and Cliff Hughes are still flush cut hand sawing (200) 8’ wide patio door enlargements for Case Contracting. Brand Anderson is still slab sawing elevated deck for Sonny Glasbrenner at the St. Pete Pier. Starting Monday Sean Zaccaria and Bryan Benjamin will be cutting out a section of concrete bleacher wall for a new restaurant at Raymond James Stadium. James Hardge has been 480 grinding 14,000 square feet at the new fitness center at University of Tampa for EWI Construction. Jason Spinks has successfully wire sawed two of the four 32” x 4 ½” thick steel legs on the steam generators at Duke Energy Nuclear Plant. Dave Horrell, Dennis Harper, Jose Riveria, Martin Kelley and Juwan Wilson have been doing a great job with keeping up with our daily service work. Starting next week Kris Weimer will be enlarging fifteen elevator door openings for Creative Contractors at Lakeland Medical Center. Richard McIntosh is keeping up with all the removal and hauling.  Jason Ferguson has been MIA on his North American Bike Tour,  hopefully his new motorcycle brings him back home! We would like to welcome back Bryan Benjamin! #citybythebay #newsworthy

Concrete Cutting, Coring, Removal, and GPR Scanning.

Speedy is Ready to Serve!!